The ‘Work Around’ the missing bridge.

It doesn’t look like we are getting a new bridge any time soon, so I’ve tried to make our work around a little more practical. The two railroad ties were uneven and wobbly, so that has been fixed and the hand rail extended a few feet.

It’s all a little rustic, but it’s all mostly scrap materials so not hurts anyone’s wallet.

I’d like to add some more rails coming down from the playing fields as those slopes are rather slippery in wet or icy conditions.

Author: Mike Caswell

I live in Fairport, and my home is at The Oxbow section of The Erie Canal. I fish, have a pontoon boat and like messing in boats. (see www.mud-skipper.com). I'm retired and enjoy every day living here with my two dogs.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: